Well it's time to start remodeling the home a bit. I will be replaceing the floors, door frames, and builting cabinet along with the fireplace mantel.
the liveingroom dineingroom and bedroom are the first to get the facelift. The Kitchen and bathroom will be later next spring. I will try to remember to post pics of the progress and show the makeing of the built in along with the door frames as long as i don't get to involved, like I normally do, and forget the cam.
My intention is to replace the painted whit pine with stained red oak. I will keep the molding and doors the sam as they are now only in oak. the moldeings will be a chalenge but I think I will be able to pull it off.
The flooring was Ordered Yesterday and should be here in a week. I will be putting down red oak 3,4,and 5 inch wide and 4 to 12 ft long I will be getting it from a guy I do bussiness with at a nice price. 800 sq ft will cost me $2000, all tongue and groved
Tour
Home remodel
Moderator: crzypete
-
- Posts: 357
- Joined: Mon Mar 13, 2006 9:33 pm
- Location: Greenville Tenn
Home remodel
I fought to keep the Gov. in power......they keep screwing around I'll fight to get rid of them.
-
- Posts: 357
- Joined: Mon Mar 13, 2006 9:33 pm
- Location: Greenville Tenn
Whew...veen a bit but still here...
Been pretty busy with one hang up or another. I got the flooring dwon in the liveingroom and did a mantel for the fireplace
I am in the middle of the new addition for the bathroom and alternate back and forth on the projects. I just hate to get bored
Tour
Been pretty busy with one hang up or another. I got the flooring dwon in the liveingroom and did a mantel for the fireplace
I am in the middle of the new addition for the bathroom and alternate back and forth on the projects. I just hate to get bored
Tour
I fought to keep the Gov. in power......they keep screwing around I'll fight to get rid of them.