Crzypete's new Studio

All strange discussion and debates

Moderator: crzypete

Post Reply
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

More siding, at this pace there will be a lot of siding pictures. Fortunately the back is broken on the end of the building, I expect the remainder of this end to go fairly quickly. The high up work is not for me. It is definitely a two person job and my brother has been invaluable in helping me hold those 10-12' long board 24' in the air.

how bout some pics
Image

we are experiencing classic late fall weather. Cold mornings- frost on everything, beautiful days, but once the sun sets, the temperature dives instantly. Here is after the sun has just set.
Image

All cleaned up as dusk approaches
Image

Let's see what does tomorrow bring.......perhaps some more siding.

Pete
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

For me today was another day filled with siding. Meanwhile up at the barn Lena was finishing the last of the staining, a project she and my brother have been steadily at work at for a while.

here is the scene at the barn
Image

The shop at the end of the day- much easier and less stressful than yesterday's work. Working alone I was able to hang more rows than yesterday.
Image

Lastly, Lena has advised me that I will bore everyone to tears with all of these siding pics. Here is a pic that gives a better lay of the land to the relation of the barns and the new shop. The tree in between is an extremely large apple tree, with pretty good tasting fruit. There are several other apple trees in that grove, but the biggest seems to have been the most bountiful. Nektai, as you can see from this post, the green from our crabgrass was short-lived, this will definitely require some work next spring.
Image
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

worked a half day today and got the rear soffit all buttoned up. Nektai, I really like the method I stole from you and your builders- it looks slick- much nicer than the stuff they sell.

Image

Pete
mr douglas t
Posts: 269
Joined: Fri Dec 17, 2004 9:58 pm
Location: Westhampton, MA
Contact:

Post by mr douglas t »

No way are the pictures boring. I am very impressed with your progress. It looks tight and clean. I can see your building is resembling your work.
nektai
Posts: 1019
Joined: Fri Dec 17, 2004 9:34 am
Location: Long Island, NY
Contact:

Post by nektai »

Thats a good combination- better looks and better function. I agree with mr D keep the pictures coming!
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

Another day of work, but unfortunately due to daylight wastings time it was too dark to get pictures from the end of the day. More siding was put up on the back of the building, My drywaller came and hung and taped the furnace room, and I started the doors for the big 10' opening.

Here is the framework for the doors. The material is a composite called timberstrand. They came as 2x4's and are extremely straight. They should make for a very stable door.
Image

Here is my homage to "2001: a space odyssey" They are big. I plan on insulating with rigid foam, sheathing the inside with baltic birch, and siding the outside with more of the pine siding. Years ago I bought some Stanley stainless steel ball bearing hinges on eBay**, they will be just the ticket for swinging these goliaths.
Image

Lots to do tomorrow, including shooting pictures of todays progress.

Pete

**as a side bar, I bought 14 of these hinges on eBay for $12 total, I finally priced these things out- they are wicked expensive- like over $40 each :shock:
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

Here is the siding on the backside that was accomplished yesterday. It goes much faster than the end.
Image

Today's project was taking it to the next level. I began work on installing the furnace and the radiant floor heating system. The furnace is a 100k BTU propane powered boiler. From reading the literature it sounds like it is very much intended to be used with radiant heat systems. Here is the end of the day today.
Image
DenaliPilot
Posts: 63
Joined: Thu May 17, 2007 8:22 am
Location: Denali, Alaska

Post by DenaliPilot »

Looking great, Pete. The pex tubing should let you easily pull those manifolds off the wall to simplify the painting when the time comes. Curious what considerations led you to select a propane boiler for your application.

Is that an air eliminator plumbed into your supply side near the circ? We have a bunch of air-challenged systems up here, and BY FAR the most effective air eliminator I have yet seen is by Spirovent. Many models to choose from based on your specific system. I'm sure you'll have a nice, tight, no-leaks, contained system, though, from the looks of all the care going into it. If you don't already have one of those hand-held, infra-red digital thermometers, they can be really nice for balancing your zones.

I'm eager for the day I get to see your shop in person, whenever that might be.

-S
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

Hey DP, The furnace system was engineered by one of the local supply houses. I am not sure what brand the air extractor that he provided is, but it is not yet pictured. As to the painting- you're funny. Looking into my crystal ball, I don't foresee painting of that room in it's future.

The choice of propane came from speaking the the experts. Every expert I talked to said propane was the better choice for the radiant heat system. As I understand it, the furnace operates very efficiently with the cooler water being pumped into it, whereas an oil system requires blenders and isn't as ideal for the system. I believe the literature is boasting over 90% efficiency when used in a radiant floor system.

Today was an epic day in the project- the first snowflakes showed up. Fortunately by the end of the day we had the building fully enclosed.

Project one for the day was working on the big doors. This has become a major priority. This morning Lena and Evan stuffed the doors with foam insulation.
Image

My job was playing with the hinges. I almost felt like a woodworker. Actually it was probably more like woodworking than building my furniture.
Image

By the late afternoon we had the opening all closed in.
Image

Ok, it turns out the plywood company snafued and sent 1/4" plywood which is too thin for the interior sheathing so we had to abandon the idea of getting the doors completed. The tarp actually makes a decent difference and running the flamethrowing salamander heater it actually got very comfortable inside.

This afternoon we threw up some more siding on the back. It continues to go well, without much effort we are more than halfway done with it.
Image

Pete
DenaliPilot
Posts: 63
Joined: Thu May 17, 2007 8:22 am
Location: Denali, Alaska

Post by DenaliPilot »

crzypete wrote:My job was playing with the hinges. I almost felt like a woodworker. Actually it was probably more like woodworking than building my furniture.
Yeah, I guess you don't have an option of heating your space with furniture-building scrap anymore, all concrete and glass and steel now... :wink:
nektai
Posts: 1019
Joined: Fri Dec 17, 2004 9:34 am
Location: Long Island, NY
Contact:

Post by nektai »

When do they drop off and hook up the propane tank?

What about the sheetrocker? I thought they were going to start the rest of the studio today?

Great progress!
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

Nektai, no sheetrock on site, so no rocker yet, tomorrow or friday I guess. I have started the propane arrangements, but with your lesson I will try to follow through and not drop that ball.

Pete
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

We had a rude awakening this morning and it wasn't just the big truck of drywall pulling up. We found this stuff all over the place.
Image

Now we also had a drywall shipment and man am I glad that I am not hanging this myself, here is the load.
Image

The drywaller is scheduled to start tomorrow morning. Lots of other progress was made today on multiple fronts. More siding was hung, but it was after dark by the time I would have taken a photo so that will have to wait for tomorrow. Slow progress on the furnace, here it is at the end of today. Two propane meetings scheduled for tomorrow.
Image
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

The drywallers showed up this morning and started hanging the two downstairs rooms. Interestingly they are hanging the sheets vertically. I asked about this and he said it was something that they didn't really do in houses. He said that it is hard to maintain even knife pressure when mudding and you tend to get a slight dip in the middle. It's less of a concern on my project, and he will efficiently be able to hang the 13' ceilings with 14' sheets. Here is the metal shop.
Image

The plywood company shipped the correct plywood today which allowed progress on the doors to resume. The day ended working by worklights and we actually have the frame up and screwed in place awaiting hinges. Here are the plywood skins going on the interior of the doors.
Image

Lastly, here is the siding form yesterday. You can see the newly cut in vent for the furnace popping through (above the saw horses). It will not actually be that long.
Image
Last edited by crzypete on Fri Nov 09, 2007 7:34 pm, edited 1 time in total.
nektai
Posts: 1019
Joined: Fri Dec 17, 2004 9:34 am
Location: Long Island, NY
Contact:

Post by nektai »

Looks great! Its almost time to move in!
Last edited by nektai on Fri Nov 09, 2007 7:48 pm, edited 1 time in total.
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

Back working on the furnace today with some major progress. With one more trip to the plumbing store tomorrow, I should have the plumbing part complete/ Next up is finishing the chimney vent, then wiring.

Image

Pete
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

Today the shop became enclosed. We found the doors to be quite extremely heavy. One hernia later here is the first door.
Image

The inside
Image

both
Image

a little more drywall as well- here is the ceiling of the upstairs.
Image

Pete
nektai
Posts: 1019
Joined: Fri Dec 17, 2004 9:34 am
Location: Long Island, NY
Contact:

Post by nektai »

How are those ball bearing hinges working out?
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

they swing........Like Buttah!
DenaliPilot
Posts: 63
Joined: Thu May 17, 2007 8:22 am
Location: Denali, Alaska

Post by DenaliPilot »

gotta admit- I was a little worried about those hinges- that is until I read that they are the ball-bearing type. Should'a known, should'a known...
Post Reply