things to not forget when building a new shop

All strange discussion and debates

Moderator: crzypete

Post Reply
mr douglas t
Posts: 269
Joined: Fri Dec 17, 2004 9:58 pm
Location: Westhampton, MA
Contact:

things to not forget when building a new shop

Post by mr douglas t »

A thread about things to remeber when building a shop.

don't forget to wire for speakers in every room before you drywall...
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

Hose Spigot.

Outside outlets.

Outside lights.
Mike Henry
Posts: 49
Joined: Wed May 25, 2005 2:14 am
Location: Chicago area

Post by Mike Henry »

And remember to paint concrete wall some shade of white or other light color. Sure wish I'd done that before moving all the machines into the basement. The lighting is a lot better for the machines along the walls that could be painted after the fact.

Mike
dadude
Posts: 258
Joined: Thu Dec 16, 2004 10:50 pm
Location: Georgetown Station, New York
Contact:

Post by dadude »

solid blocking in framing for specific wall and cieling mounting

door width, height and swing

storage

floor drain for wash bay (nothing like a clean truck)

capable concrete guy for floor

dust control for office

finish room location

secondary exhaust for finish room (for airflow after spray)

delivery access

hard surface apron exterior of overhead door if gravel driveway

RADIANT HEAT FLOOR
crzypete
Posts: 1691
Joined: Thu Dec 16, 2004 10:45 am
Location: New York State
Contact:

Post by crzypete »

Welcome back Dadude!

P
dadude
Posts: 258
Joined: Thu Dec 16, 2004 10:50 pm
Location: Georgetown Station, New York
Contact:

Post by dadude »

i'll try and behave!
dadude
Posts: 258
Joined: Thu Dec 16, 2004 10:50 pm
Location: Georgetown Station, New York
Contact:

Post by dadude »

a skidsteer
Post Reply