A thread about things to remeber when building a shop.
don't forget to wire for speakers in every room before you drywall...
things to not forget when building a new shop
Moderator: crzypete
-
- Posts: 269
- Joined: Fri Dec 17, 2004 9:58 pm
- Location: Westhampton, MA
- Contact:
-
- Posts: 49
- Joined: Wed May 25, 2005 2:14 am
- Location: Chicago area
solid blocking in framing for specific wall and cieling mounting
door width, height and swing
storage
floor drain for wash bay (nothing like a clean truck)
capable concrete guy for floor
dust control for office
finish room location
secondary exhaust for finish room (for airflow after spray)
delivery access
hard surface apron exterior of overhead door if gravel driveway
RADIANT HEAT FLOOR
door width, height and swing
storage
floor drain for wash bay (nothing like a clean truck)
capable concrete guy for floor
dust control for office
finish room location
secondary exhaust for finish room (for airflow after spray)
delivery access
hard surface apron exterior of overhead door if gravel driveway
RADIANT HEAT FLOOR